BlogHide Resteemsloop-manager (43)in hive-101145 • 2 years agoTestTestloop-manager (43)in hive-101145 • 4 years agoTestTestloop-manager (43)in hive-101145 • 4 years agoTestTestloop-manager (43)in hive-101145 • 5 years agoNight View from the SeaSo beautiful and something different from daily view. NG will run through before summer.loop-manager (43)in sct • 5 years agoPig arrived.loop-manager (43)in sct • 5 years agoPower onFinally, we got the power for jetty system. System will be ready and we'll reach the goal.loop-manager (43)in sct • 5 years agoRoad no. 30We are running on road no. 30 through the dark every in the morning. I hope all the work in safety and coming back to sweet home.loop-manager (43)in sct • 5 years agoParm Tree over the painting.I found beautiful painting art in the immigration office. Live parm tree really matching with Kuwait tower and fishing boat in the painting also.loop-manager (43)in sct • 5 years agoFolder preparationThe preparation of folder is the first step for loop test activity and it is very essential. Required drawing/documents are depend on contractual agreement. However, in general, below listed are…loop-manager (43)in sct • 5 years agoLoop TestLoop test is a pre-commissioning activity and last step before commencing the commissioning of system or plant. It can be performed after construction completion. During the testing, we can…loop-manager (43)in sct • 5 years agoHousekeeping [Photo]We are doing daily housekeeping to maintain our working area clean and safe.loop-manager (43)in sct • 5 years agoDatesUnder the piercing sunshine and the steaming hot wind, the dates are ripening. Photo from Korean guest house in Khiran, Kuwait.loop-manager (43)in sct-en • 5 years agoTeam building - We are the best.We are here to complete the best project in Kuwait. I think it's the best team i've ever worked on. Thanks to everyone on the team.loop-manager (43)in sct • 5 years agoDon't forgetWe need to use proper tools for all activities. Improper tool using will result in cost and schedule impact. Above photo shows somebody used screw drivers instead of key for opening the door.…loop-manager (43)in sct • 5 years agoTK3Loop tests are on-going and we are using TK3 micrometer for axial vibration simulation.loop-manager (43)in sct • 5 years agoProtection is required.Network cable laid without protection. It could be damaged easily even indoor. Need to be rectified.loop-manager (43)in sct • 5 years agoTestSystem will be ready in some days.