this is a base A work, this is done after the base B spreads before it, base A is smaller than base B before it, this dumping is done with dump truck, this is the final stage before the asphalting work, after being spread with the dump truck it will be there is work using the grader, which we will discuss with the n# headerext picture,
spread of base A
7 years ago by contractor (38)
$0.28
- Past Payouts $0.28
- - Author $0.27
- - Curators $0.01
14 votes
- + good-karma: $0.250 (0.5%)
- + bitcoiner: $0.010 (0.5%)
- + esteemapp: $0.006 (1%)
- + isteemit: $0.004 (0.05%)
- + feruz: $0.004 (1%)
- + meysam: $0.002 (0.25%)
- + contractor: $0.002 (100%)
- + bounties: $0.000 (1%)
- + steempoll: $0.000 (1%)
- + demo: $0.000 (1%)
- + tipping: $0.000 (1%)
- + mxzn: $0.000 (0.05%)
- + mysteem: $0.000 (1%)
- + rebele93: $0.000 (0.5%)