In concrete construction work there are several aspects that must be considered by civil engineering engineers, especially in formwork installation work, because this is very influential and determines the results of concrete work, one of which is the quality of formwork to be used must be appropriate and appropriate and in accordance with the drawing plan determined for the structural work to be done, starting from the surface of the formwork to the leveling to get every dimension that will be used and worked out to be flat so that the work has the best quality.

IMG_20181005_220744.jpg

Then another aspect that must be considered is the safety for construction workers while carrying out the work, for that the formwork to be installed must be strong enough to withstand the pressure of concrete during casting later, so that the concrete does not collapse and cause waves on the concrete surface, let alone bring danger to workers because of the lack of formwork installed.

IMG_20181005_220808.jpg

And the last aspect that must be considered is that the costs incurred for using formwork that must be planned as economically as possible but do not reduce the quality of the defenses, an engineer must calculate each item of work using an analysis that has been determined by the applicable law.

IMG_20181005_220724.jpg

IMG_20181005_220734.jpg

IMG_20181005_220756.jpg



All of the pictures above that I uploaded, I captured using the Oppo F1s smartphone camera

Location of Aceh Sumatera



If you like this post do not forget Upvote and Follow @sofianmbs

Thank you very much



Authors get paid when people like you upvote their post.
If you enjoyed what you read here, create your account today and start earning FREE STEEM!
Sort Order:  
  ·  6 years ago Reveal Comment