Jakarta - Seven toll roads are targeted to operate in May 2018. Therefore, the evaluation team consisting of Ministry of PUPR, Ministry of Transportation and Traffic Corps of the Republic of Indonesia of the seven toll roads in operation immediately.
The seven toll roads to be evaluated include the Solo-Ngawi toll road Seksi Kartosuro-Simpang Susun (SS) Sragen (36 km), Toll Bogor Ring Road Section 2B Kedung Badak-Simpang Yasmin (2 km), Medan-Kualanamu-Tebing Tinggi Highway MKTT) Section 1 SS Tanjung Morawa-SS Parbarakan (10.75 km), Gempol-Pasuruan Toll Road Section 2 SS Rembang-SS Pasuruan (6.6 km), Dryport Cikarang Toll Road Jakarta-Cikampek (3.5 km), Toll Section Brebes East-Sewaka (37 km) and Sewaka-SS Pemalang Section Pemalang-Batang Section (5.2 km).
This post has received a 0.81 % upvote from @booster thanks to: @mutiara4.
Downvoting a post can decrease pending rewards and make it less visible. Common reasons:
Submit