This valley was at the bank of Swat River. Through crossing Bridge, we reached at rough path. After crossing the rough path, we reached near the Chail Village.
4.4. Visit to Bio-Engineering Model:
After crossing the bridge, team visited bio-engineering model. Different trees which controlled the erosion of hills were installed there. Hundred Popular trees, fifty Robiniya trees and twenty Atlantas trees were installed in this model. This model was made by the partnership of WWF. MOU was signed with Baidar e Kull CBO. The population of Chail Village was including 150 HH.