half a day already we have not worked. when the engine is turned on, and starts operating, suddenly a very large sound is heard. it turns out that a lot of bolts are dislodged inside the engine, and there is a broken iron in it.
we were forced to open it first. and bring it to the welder to connect the broken iron. and then we bought 3 bolts that came off. This takes a long time.
it seems like today we have to work late at night. if not, then the target to prepare 3 hectares is not achieved. what about the activities you are doing today?