GAChain latest news
2018.10.08
GAChain was invited to Zhongcheng new industrial zone opening ceremony, stating GAChain’s layout in industrial internet.
Technology and Projects Progress
E-Nanshan Government Project
Front-end
Optimized the problem of slow menu loading after login;
Displayed the first menu in accordance with permissions after login;
Modified the page of event schedule;
Added message notification and data sheet validation in accordance with design drafts;
Added data dictionary code enable/disable function;
Solved operation permission display problem on event catalogue page;
Fixed relevant bugs of event deployment;
Accomplished the correction and withdrawal function of events.
Back-end
Event registration column displayed published events only ;
Corrected the event configuration checking list interface;
Reset manual input of item code and sub-item code;
Fix permission bugs in accordance with testing permission;
Shielded deleted units interface;
Added events pending withdrawal function;
Restored draft editing;
Encrypted on-chain data.
Test
Conducted test of events pending and processing, uploaded bugs to TAPD;
Conducted permission test, uploaded bugs to TAPD;
Retested modules of homepage, background management ( unit management, user management, character management and menu management);
Retested modules of enterprise units management, data dictionary and holiday management;
Regression test of fixed bugs on TAPD;
Deployed server test environment of North-China Alibaba Cloud;
Testing manual function of registration window;
Tested on-chain contracts, uploaded bugs to TAPD.
GAChain
Fixed security problem of digital signature;
Fixed problems of permission and character validation;
Optimized system parameters;
Optimized parts of data sheet types;
Optimized basic applications and data transmission;
More information logs added;
Deleted parts of useless interface.
Client:
Transaction logic generation function added;
Fixed notification and incorrect notification number issues;
Fixed scroll bar and label display issues;
Adjusted interface routing and built deployment logic.