First installation for the month of September, 2024 (2.5KVA solar system)

in hive-108686 •  2 months ago  (edited)

IMG_20240921_005208_043.jpg

After posting my Steem Solar & Electricals report for August 2024 a few days ago, it was a little bit weird as I couldn't make much profit that month, and I didn't do any solar installation. However, I remained optimistic about September's prospects.

I got some interesting encouragement from friends.

The happy time

Three days ago, I received a call from an unknown number. The caller asked if I was at the shop, and I confirmed. 15 minutes later, he arrived and began inquiring about solar installation for his video-game shop.


He also expressed frustration about the substantial amount he'd spent on petrol recently and criticized the government's negligence regarding the struggles of the common people of the country.


To cut the long story short, we reached an agreement, and he made the payment. The installation was completed on Thursday 19th September, 2024! 😊


The installation

System profile:

  • Inverter - 2.5KVA
  • Voltage - 24V
  • Panel - 400W (6 pieces)
  • Charge controller- 60A (MPPT)
  • Battery - 220Ah Tubular (4 pieces)
  • Wire - 10mm
  • Location: Game Haven, Ekamba Nsukara-Nwaniba

It was a big installation that took almost my entire day, hence, the reason I couldn't post the interview showcase on Thursday this week due to how busy I was.


20240919_093920.jpg
I still have them plenty, come for it


I first sorted out the components and my tools.

20240919_094023.jpg
About shipping the panels to the site


And I made arrangements for a tricycle to convey it to the site. I had to plead with the driver to help take these photographs 😀


Since this was a heavy job that has to do with lifting of the panels, I needed a helper, so I invited one more person to assist in atleast lifting the panels.


The weather was good and harsh 😀 because of the sun. But this is what I love to do, so I didn't mind.

20240919_113013.jpg
Work is about to start


Stage 1: Panel mounting

I started my installation by mounting the panels. These are heavy panels that required two people to lift if to the roof.

20240919_101616.jpg
Before mounting panels


A very important part I'll like to highlight here is that the panel connections were series-parallel configuration since it is a 24 Volt system.

That is - 3 solar panels were connected in series (1200W, 60V), while 2 sets of series-connected panels were connected in parallel.



20240919_115238.jpg
My assistant tightening the first panel based on my directives


IMG_20240920_134050_871.jpg
Connecting the panels


I did the entire connections by myself while my assistance was just helping me to hold the panels.


IMG_20240920_134050_489.jpg
As the CEO of Steem solar & electricals, I ensured a proper installation for a better functionality


It is important to give attention to this panel configuration.


20240920_090253.jpg
Panels installation is successfully done!


After spending 4 hours on the roof, the solar panel installation was successful.



Stage 2: Connecting the batteries

20240919_111431.jpg
Before installing the battery



Screenshot_20240920-225201_Video Player.jpg
Installation of batteries


Remember, this sytem is a 24V system and connecting 4 tubular batteries(220A) for a 24V inverter requires a specific configuration to ensure safe and efficient operation as it should.

Each of the battery were 220Ah by 12V battery.


To achieve 24V, I connected the batteries in series-parallel configuration as I explained below.

I'll choose to label my batteries as follows for explanation purpose :

  • Battery 1
  • Battery 2
  • Battery 3
  • Battery 4

While,

+ for positive terminal
- for negative terminal


20240920_233122.jpg
Battery configuration diagram


Let's understand the diagram's connections which are in two form

Series Connection (2 sets of 2 batteries)

  • Connect Battery 1 (+ terminal) to Battery 2 (- terminal). [First series]

  • Connect Battery 3 (+ terminal ) to Battery 4 (- terminal) [Second series]


Parallel Connection (2 series sets):

  • Connect first series (+ terminal) to second series (+ terminal)

  • Connect first series (- terminal) to second series (- terminal)


Last Connection:

  • Connect the combined (+ terminal) to the inverter's 24V (+ terminal) input
  • Connect the combined (- terminal ) to the inverter's 24V (- terminal) input

The whole of these explanations were what I did, so I am taking time to explain how this is connected.



After the entire battery connections, I connected the 24V battery bank to the 2.5KVA, 24V inverter system and then the MPPT charge controller to 24V battery bank.


Note that it is the battery that is connected first before connecting the panel array to the MPPT charge controller.


Check out the result below..

20240920_085601.jpg
And the work is done!



I spent almost 7 hours on this installation, but I am grateful, it was a success and my client was happy with my services.

20240920_085732_1.gif

It was a stressful day, but it was a money making day 😀

Should you need such services or a solar installer, please kindly contact me especially if you are from Nigeria.


Also, I can carry out solar installation in any part of Africa and outside Africa.


Steem solar & electricals
(21st September, 2024)
(CEO/MD)
Ubongudofot

Vote for @ pennsif.witness
Vote for @ moecki
Authors get paid when people like you upvote their post.
If you enjoyed what you read here, create your account today and start earning FREE STEEM!
Sort Order:  

Nice work mate, i am sure the buyer will be happy with the purchase.

Very tidy install.... not that i know anything but it looks tidy & professional!

Thank you so much, I get better everyday with my installation techniques.

Ofcourse he was very happy despite the high cost of buying it.

Now, with this, he can operate his game house smoothly.

Got to keep that Game house open :)

Have a good weekend brother

What great news! I hope this is a good boost for your business. I am glad that you happened to have such a client. If he remains satisfied, it will be the best advertisement for your company. I wish you further success! 🙂

Thank you so much. My client was so satisfied with my job, he loves how fast I was able to deliver with accuracy.

Update

Something good might just be coming up...😉😀

That is awesome job that you have done, you are one man business and that makes it a bit difficult because the whole process is done by you, being a seller, finding client via advertisement. Also the whole work that needs to be done on roof laying the panels and connecting correctly. Everything depends on these little nuances. It always will be good time with good business and then some quite time, wishing all the best for you!

Thank you so much..., I think doing all those things are training. In the future when I have grown in the business..., I will have people who will assist me in most of those things. I am grateful for your nice feedback.