The Akosombo Dam ( A great tourist Site in Ghana)

in hive-184437 •  4 years ago 

image.png
Akosombo Dam, rock-fill dam on the Volta River, near Akosombo, Ghana, completed in 1965 as part of the Volta River Project. Its construction was jointly financed by the government of Ghana, the World Bank, the United States, and the United Kingdom.
image.png
The dam rises 440 feet (134 m) above ground level and has a crest 2,201 feet (671 m) wide and a volume of 10,451,000 cubic yards (7,991,000 cubic m). The dam impounds Lake Volta; this huge reservoir has a capacity of 124,000,000 acre-feet (153,000,000,000 cubic m) and is used for commercial fishing and navigation. The large electric-power-generating capacity (912 megawatts) of the Akosombo Dam meets Ghana’s needs and provides a surplus for sale to neighbouring countries. The dam supplies electricity to a large, economically important aluminum smelter in the coastal town of Tema.
image.png
The Construction of the Akosombo Dam made the Lake Volta ;
Lake Volta, artificial lake in Ghana. The lake is formed by the Akosombo Dam (q.v.), which, begun in 1961 and completed in 1965, dammed the Volta River just south of Ajena and created a lake extending upstream from the Akosombo Dam to Yapei, beyond the former confluence of the Black Volta and White Volta rivers.
Shallow staghorn water corals in fringing reef at low tide in Thailand. (coral reefs; endangered area; ocean habitat; sea habitat; coral reef)
image.png
With a storage capacity of 124,000,000 acre-feet (153,000,000,000 cubic m) of water, Lake Volta is one of the largest man-made lakes in the world. It is about 250 miles (400 km) long and covers 3,283 square miles (8,502 square km), or 3.6 percent of Ghana’s area. The lake’s creation involved the inundation of 15,000 homes and of 740 villages and the resettlement of 78,000 people. The lake is navigable and provides a cheap route linking Ghana’s northern savanna with the coast. It also is a major fishing ground and provides irrigation water for farmland in the dry Accra Plains lying immediately below the damsite.
image.png
The generating capacity of the dam’s hydroelectric power plant is 912 megawatts of electricity; this power is used by the aluminum smelter located at the port of Tema on the Gulf of Guinea and supplies most of Ghana’s other electricity needs as well.
The Akosombo Dam was the first Electo power Generator in Ghana and a great place to explore the rich history of Ghana .... Thanks guys have a Good one😍

Authors get paid when people like you upvote their post.
If you enjoyed what you read here, create your account today and start earning FREE STEEM!