Civil Engineering Work

in steemit •  6 years ago 

IMG-20180815-WA0003.jpg


The Urban Drainage System Technical Planning Process is a process that starts from the preparation of a master plan, feasibility study or Feasibility Study, to planning the detailed design or Detail Engineering Design. This process includes survey, investigation and design work-jobs.


IMG-20180815-WA0002.jpg


General provisions that must be fulfilled are to be able to make detailed planning of drainage system techniques, a feasibility study must be carried out from the drainage system master plan.


IMG-20180813-WA0000.jpg


Authors get paid when people like you upvote their post.
If you enjoyed what you read here, create your account today and start earning FREE STEEM!